Entrance Matting

Frameworks 22C at Princess Dock, Liverpool

  • Project: Princess Dock, Liverpool
  • Product used: Frameworks 22c with MW EXT & Workspace Entrance Vulcan inserts
  • Quantity: 15m2
  • Contractor: Jennor UK Ltd

Frameworks 22c was chosen as the preferred product which meant that no further screeding works were required to the existing subfloor.

The external half of the revolving door on this job used our MW EXT inserts as this was open to the elements and the rest of the mat used WSE Vulcan.

Interested in using these
products in your next project?